BAE Systems

New Advanced Hawk

Morson Projects internal process of concurrent engineering capability allows us to deliver in challenging timeframes – we delivered the new wing design for the advanced Hawk in 7 months, when the initial forecast was 18 months.

Spirit Aerospace

A350 Fixed Leading Edge (FLE)

Morson Projects were appointed by Spirit Aerosystems for the analysis and design of metallic and composite parts for the Mid and Outer Fixed Leading Edge of the A350-1000 C-MAT and DFM, including complete programme management.

Airbus

A320 Fuel System Review

As a strategic supplier to Airbus UK, Morson Projects were tasked to review fuel systems associated with the A320 family of aircraft.

Spirit Aerosystems

A350 MOFLE

Morson Projects were responsible during C-MAT and DFM for the analysis and design of metallic and composite parts for the mid and Outer Fixed Leading Edge, for the A350-1000.

Airbus

A380 HTP Transportation Fixture

Morson Projects were appointed by Airbus to support them with the engineering design of a A380 HTP Transportation Fixture.

Bombardier

C-Series Composite Wing Development

Morson Projects were appointed by Bombardier to provide a comprehensive Manufacturing Engineering build solution for the C-Series Composite Wing Development Test Program.

BAE Systems

Defence Information Software

Morson Projects were appointed to deliver a Software Development solution for BAE Systems’ Defence Information Software.

Leonardo

Information Environment Systems

Morson Projects were appointed by Leonardo to provide a cost effective resource solution for their Information Environment System (IES) Department.

BAE Systems

Joint Strike Fighter (JSF) F-35 Lightning II

Morson Projects resourced the JSF F35 Lightning II project utilising our existing Aerostructures Design & Analysis teams, supplemented with resource support via Morson International, creating a team of over 150 engineers.

Senior Aerospace

MRJ-200 Aircraft

Morson Projects were appointed by  Senior Aerospace to be responsible for the refining of the Low Pressure Ducting System design for the Mitsubishi Aircraft Corporation MRJ-200 Aircraft.

Leonardo

Reliability Centred Maintenance (RCM) Review

Morson Projects were appointed by Leonardo Helicopters to undertake a Reliability Centred Maintenance (RCM) Review.

Bombardier

Learjet 85 Joint Definition & Detail Design Phase Support

Morson Projects were appointed by Bombardier to deliver Design Phase Support for the Learjet 85.