BAE Systems

New Advanced Hawk

Morson Projects internal process of concurrent engineering capability allows us to deliver in challenging timeframes – we delivered the new wing design for the advanced Hawk in 7 months, when the initial forecast was 18 months.

Siemens

Overspeed Test Rig

Morson Projects were appointed by Siemens to design, manufacture and install on-site a new overspeed test rig for one of their turbines.

Dounreay Site Restoration Ltd

Duplex Pipe System

Morson Projects were appointed by Dounreay Site Restoration Ltd to carry out the analysis of a duplex pipe system which spanned between two buildings, on a lead-shielded bridge using Caesar II software.

Senior Aerospace

MRJ-200 Aircraft

Morson Projects were appointed by  Senior Aerospace to be responsible for the refining of the Low Pressure Ducting System design for the Mitsubishi Aircraft Corporation MRJ-200 Aircraft.

Bombardier

Materials Allowables Development

Morson Projects were appointed by Bombardier to provide design support for the CS100 Wing to Body Fairing (WTBF).